Building Retrofit Diary:
Main University Building Vilnius, Lithuania
This diary consists of quarterly reports of the status of the demonstration site
written by the responsible demonstration partner. |
|
General Overview
Description of the renovation and its purpose Having in mind
that the building is in use more than thirty years, it is suggested the following: to correct the operation of renovated thermal unit
and complement a part of its automatics, still better effect should be reached. Reduction of glazed areas with the warmed up shields,
renovation of facades as well as change of current windows will have a very important impact on energy saving. Besides, with partial
renovation of illumination and electrical engineering it is also unavoidable that people working inside the building get interrupted.
The efficiency level of the main VGTU building's refurbishment depends on a great many of factors, including: cost of refurbishment,
annual fuel economy after refurbishment, tentative pay-back |

 |
time, harmfulness to health of
the materials used, aesthetics, maintenance properties, functionality, comfort, sound insulation and longevity, etc. Solutions of an
alternative character allow for a more rational and realistic assessment of economic, ecological, legislative, climatic, social
conditions, traditions and for better satisfaction of architectural, comfort, functional, maintenance and other customer requirements.
They also enable one to cut down on refurbishment costs. The developed Multiple Criteria Decision Support System for Building
Refurbishment will allow to assess alternative designs of the main VGTU building's refurbishment, multiple criteria analysis and make
the selection of the most efficient versions, etc.
Status up to today In the process of renovation the balance between
the three components building envelope, heating and ventilation must be kept. Because of the financial shortages attention was not paid
to the third renovation component, i.e. ventilation and in consequence the ventilation system was not foreseen to be refurbished. Now the
authorities of university are planning to retrofit the ventilation system. |
|