|
|
Building Retrofit Diary:
Prøvehallen Copenhagen, Denmark
This diary consists of quarterly reports of the status of the demonstration site
written by the responsible demonstration partner. |
|
General Overview
Description of the renovation and its purpose The purpose of
the project is to renovate Prøvehallen and thereby turn it into a cultural centre with sports facilities such as a climbing wall,
sports hall, etc. The net floor area of the renovated building will be 2500 m². This renovation will be realised in connection with
the renovation of the building next to it, Ovnhallen, which will be converted into a school. There will be a lot of attention around the
refurbishment of these two buildings as it is happening in an old industrial part of Copenhagen, that now will be completely reshaped,
modernised and made into a new neighbourhood with its own identity. There are plans for large scale integration of PV-cells on several
buildings in the area. |

 |
Status up to today
Design work completed, external building work completed. New frames for the windows inserted. Preparatory work with ventilation system
and BEMS system undertaken. |
|